Costello
Project details
Project Costello
Not every project goes perfectly—and we’re okay admitting that.
This renovation came with a few mistakes on our end and unexpected material delays that extended the timeline. We took responsibility, kept our client informed every step of the way, and stayed committed until the project was completed the right way.
This renovation included:
– 8mm LVP flooring
– 12” × 24” tile surround
– Black trim sliding shower door
– Black rainfall shower system & fixtures
– New black toilet
– New vanity & mirror
– Mold-resistant drywall and Contractor Grade Paint
– Complete bathroom transformation
We’re proud of the final result and thankful to our clients for their patience and trust. We believe great contractors aren’t the ones who never face challenges—they’re the ones who own them and deliver.